Control and guide rivers and floods Bridge protection Flood dams and diversion dams Rock fall protection Prevent water and soil loss Retaining walls Road protection Solid soil structure Coastal defense engineering Port engineering
The construction combination and stone filling steps can be summarized as follows:
Combine the unit structures before placing them
The structure of the pad combination is placed at the construction site, and the cell structures are connected by wire bonding.
Filling stone in the structure
Cover the structure and fasten it with a tie.
If you have an idea to buy or consult a hexagonal wire mesh, please contact us via the message board or email, we will provide the best offer.