The base of the Gebin retaining wall should be dense and the depth of the foundation cage should be included, including the length of the contour line. It should be implemented according to the construction drawing. The design requirements of the second phase are also very important. In the case of the base soil, we have to do the base treatment from the new ones. To do the riprap in the water and to process the foundation after the mudstone is extruded. The Gebin webpage must meet the requirements and be centered on the strict drawing design. The criss-crossing between the cage layer and the layer, there is also a shape of the title, there can be no cracks, each cage is to be placed neatly, to be layered.
In geotechnical engineering applications (especially in terms of basic treatment), when the geotechnical conditions of the engineering construction site cannot meet the engineering design requirements, in order to ensure the stability and normal use of the building, it is necessary to take improvement measures and use the products produced by our factory. The artificial soil improvement can be carried out by the Gebin retaining wall material.
The use of an ecological grate network can greatly increase the stiffness and strength of the soil and therefore can handle weak foundations. When the local foundation of the composite foundation of the Gebin retaining wall is deformed by a large load, the frictional resistance at the interface between the retaining wall and the soil will increase and the restriction on the lateral deformation of the soil will be enhanced; After pulling, a vertical component force will be generated to support the load; thus, the vertical deformation of the foundation is reduced, and the bearing capacity of the foundation and the stability of the foundation are increased.
The Gebin retaining wall has good water permeability, can collect underground water to excrete it, and has certain consolidation drainage effect.